What happens today
A fault appears on a local controller. Somebody is called, drives, walks to the asset, reads a lamp or a code, and rings back — or presses reset and drives back.
Guided kit line · 57 panels, one BOM shape
Vibration analysers, dust collector controllers, local control stations, analysers, dosing skids, pump stations, dam decant pumps, weighbridges, loadouts. Almost all of them expose UART, Modbus RTU or TCP, 4–20 mA, a dry contact, or a face made of pushbuttons and illuminated indicators — and none of them were designed to be reached from anywhere. PanelAccess puts a remote I/O module across that existing interface and drives it over 4G, NB-IoT, LoRaWAN or WiFi into a web app, PLC, DCS, historian, cloud or on-premises system.
A 40 km round trip, an hour and a half of a technician's time and a vehicle is a few hundred dollars before anyone has touched the asset. The panel usually already publishes what is wrong. It simply publishes it somewhere a person has to stand.
A fault appears on a local controller. Somebody is called, drives, walks to the asset, reads a lamp or a code, and rings back — or presses reset and drives back.
The same state is read from a browser or a PLC tag. A documented control input can be driven remotely. A C2 state is reported and escalated, and nobody presses anything.
The controller, router, power supply, DIN enclosure and harness are shared. What changes is the interface in front of them and the number of I/O points. Families share a landed cost; each kit resolves its own price from its family plus its own I/O variation.
16 digital inputs, 8 relay outputs, PSU, enclosure, harness, 4G or NB-IoT router. Replaces the pushbutton and illuminator face of a legacy controller.
RS-485 or RS-232 gateway to the port the OEM documents, same PSU, enclosure and router. Read by default; writes only where the OEM documents a control input.
A node at the asset and a shared gateway where one exists. No panel penetration and no output at all — level, temperature, vibration, bund, tank.
Isolated inputs only. The module has no output path — not disabled, absent. Fire panels, gas detection, safety interlocks, e-stop status, burner management, flare headers, deluge.
Each row is a named application: the asset it replaces a walk to, the interface it uses, and the wireless path chosen for that site type. Ask for a written quotation and you get one for the kit you named.
| Kit | Asset and industry | Existing interface | Wireless path | Class |
|---|---|---|---|---|
| VibraAccess RA-01 | Vibration analyser local panel — fixed plant, hard rock and iron ore | UART/RS-232 to the analyser + DI/DO takeover of the 6 front-panel keys and 4 LEDs | 4G LTE (site has no panel LAN, and the analyser cabinet is outside the plant network) | C0 full takeover |
| DustLink RA-02 | Baghouse / dust collector controller — grain receival and bulk transfer | DI/DO pushbutton + illuminated-indicator emulation on the OEM controller's front panel | 4G LTE with an external whip antenna at the baghouse roof | C0 full takeover |
| LubeSkid RA-03 | Mill lube skid local panel — concentrator, SAG and ball mills | Modbus RTU over RS-485 to the skid PLC + 4 DI for local fault lamps | 4G LTE (skid is 400 m from the nearest switchroom) | C0 full takeover |
| CrusherHyd RA-04 | Crusher lube and hydraulic panel — hard rock crushing circuit | DI/DO takeover of start/stop/reset and 8 status lamps; no analogue | 4G LTE (crusher bench has no usable cable route) | C0 full takeover |
| FlocDose RA-05 | Thickener flocculant dosing station — mineral processing | 4–20 mA dose feedback + DI/DO for pump run/fault/mode | 4G LTE (thickener bridge has no network drop) | C0 full takeover |
| ReagentDose RA-06 | Reagent dosing and metering skid — industrial chemical and water treatment | Modbus RTU to the skid controller + 2 DI for leak and low-level | NB-IoT (skid sits in a bund with poor LTE coverage and needs a low-power link) | C0 full takeover |
| SumpDewater RA-07 | Sump / dewatering pump station — mining, tunnelling, civil | DI/DO takeover of auto/manual/hand and 6 status lamps; float states as DI | NB-IoT (pit floor, no power for a router beyond the panel's own supply) | C0 full takeover |
| SweepAuger RA-08 | Silo sweep auger local station — grain storage and receival | DI/DO across the local start/stop station with illuminated status | LoRaWAN site gateway (the silo roof already carries a gateway for level nodes) | C0 full takeover |
| AerationFan RA-09 | Silo aeration fan bank — grain storage | DI/DO per fan starter with run/fault lamps; 8 fans per kit | LoRaWAN (fan bank is 800 m from any building; no cable route) | C0 full takeover |
| WeighbridgePanel RA-10 | Weighbridge local panel and indicator — grain receival, quarry, waste | RS-232 / Modbus RTU to the indicator, plus 2 DI for barrier and loop | 4G LTE (cabin has a phone line only) | C0 full takeover |
| ShiploaderStation RA-11 | Ship loader local control station — bulk terminals | DI/DO takeover of the local jog/stop/boom keys and 10 status lamps | 4G LTE with a directional antenna at the loader | C0 full takeover |
| StackerStation RA-12 | Stacker / reclaimer local control station — stockyard | DI/DO to the local station with 12 status lamps and 4 command keys | 4G LTE (stockyard cable is a maintenance liability) | C0 full takeover |
| BeltScale RA-13 | Belt scale and belt-sway panel — conveyors, bulk transfer | Modbus RTU to the integrator + 4 DI for sway trips | 4G LTE, or plant WiFi where the switchroom reaches the panel | C0 full takeover |
| CompressorHouse RA-14 | Compressor house control panel — plant air, all industries | Modbus RTU to the compressor controller + 4 DI for dryer faults | 4G LTE (compressor house is a separate building) | C0 full takeover |
| ChillerLocal RA-15 | Chiller local control panel — HVAC, process cooling, cold chain | Modbus RTU or the OEM's own RS-485 protocol + 3 DI | WiFi (plant LAN already reaches the plant room) | C0 full takeover |
| ScrubberDP RA-16 | Scrubber differential-pressure panel — industrial chemical | 4–20 mA DP transmitter loop + 2 DI for fan run/fault | 4G LTE (scrubber tower has no network) | C0 full takeover |
| TankFarmBoard RA-17 | Tank farm local gauge board — chemical, fuel, water | 4–20 mA per level transmitter (8 loops) + 2 DI for high-level switches | 4G LTE, or LoRaWAN where the farm already has a gateway | C0 full takeover |
| BundSump RA-18 | Bund / drainage sump pump panel — chemical storage areas | DI/DO takeover of the local pump control with high-level and fault DI | NB-IoT (low power, deep bund, no data appetite) | C0 full takeover |
| BoreField RA-19 | Bore field starter panels — remote water supply, mining camps, agriculture | DI/DO per bore starter (4 bores per kit) + 4–20 mA flow | NB-IoT (bores are kilometres apart, no power beyond the starter) | C0 full takeover |
| PipelineValve RA-20 | Pipeline valve station local panel — oil & gas, water, slurry | DI/DO for open/close/stop and position limit switches + 4–20 mA line pressure | 4G LTE (stations are spaced tens of kilometres apart) | C0 full takeover |
| TailingsDecant RA-21 | Tailings dam decant pump station — mining | DI/DO takeover of the decant pump panel + 4–20 mA pond level | 4G LTE (dam is beyond site fibre) | C0 full takeover |
| CampPower RA-22 | Camp power station local panel — remote camps, construction | Modbus RTU to the genset controller + 4 DI for breaker and fuel | 4G LTE (camp network is for residents, not plant) | C0 full takeover |
| PumpStationRemote RA-23 | Remote water pump station — utilities, irrigation, mining supply | DI/DO takeover of the local control + 4–20 mA pressure and flow | NB-IoT (single low-power link, no site network) | C0 full takeover |
| ScreenDeck RA-24 | Screen deck local control panel — quarry, crushing, recycling | DI/DO takeover of start/stop/reset and 6 status lamps | 4G LTE (mobile plant, no fixed network) | C0 full takeover |
| ApronFeeder RA-25 | Apron feeder local station — crushing and material transfer | DI/DO takeover of run/jog/stop and 4 status lamps | 4G LTE (feeder is on a bench with no cable) | C0 full takeover |
| DryerLocal RA-26 | Grain dryer local control panel — receival, feed mills | DI/DO takeover of the dryer keypad functions + 4–20 mA plenum temperature | 4G LTE (dryer is in a paddock, not the shed network) | C0 full takeover |
| ReceivalPit RA-27 | Grain receival pit local control station — receival and storage | DI/DO takeover of pit start/stop, grid and auger status | 4G LTE (pit is below grade, antenna mounted above) | C0 full takeover |
| TrainLoadout RA-28 | Train loadout local station — bulk terminals, grain, coal | DI/DO takeover of load/stop/spout keys and 8 status lamps | 4G LTE with a mast antenna at the loadout | C0 full takeover |
| CarDumper RA-29 | Car dumper local panel — coal and bulk terminals | DI/DO takeover of 10 status lamps and 4 command keys, read-first profile | 4G LTE (dumper house is outside the plant LAN) | C0 full takeover |
| AgitatorLocal RA-30 | Slurry agitator local starter panel — mineral processing, chemical | DI/DO takeover of start/stop and run/fault lamps | 4G LTE (tank farm edge, no network) | C0 full takeover |
| FilterPress RA-31 | Filter press local control panel — mineral processing, water, chemical | DI/DO takeover of cycle advance/close/open and 8 status lamps | 4G LTE (press house has no data drop) | C0 full takeover |
| ThickenerRake RA-32 | Thickener rake drive local panel — mineral processing, tailings | Modbus RTU to the VSD driving the rake + 4 DI for torque alarms | 4G LTE (bridge deck, no network) | C0 full takeover |
| AnalyserModbus RA-33 | Process gas analyser — industrial chemical, refinery, cement | Modbus RTU over RS-485 to the analyser's documented port | 4G LTE (analyser house is a separate building) | C1 read + documented writes |
| FlowComputer RA-34 | Flow computer — oil & gas, water, slurry pipelines | Modbus RTU to the flow computer + 2 DI for batch start/end | 4G LTE (metering station has no network) | C0 full takeover |
| PowerMeter RA-35 | Energy meter / sub-metering panel — all industries | Modbus RTU or Modbus TCP to the meter (up to 8 meters per kit) | 4G LTE, or plant WiFi where the switchroom is covered | C0 full takeover |
| VSDParam RA-36 | Variable speed drive panel — pumps, fans, conveyors | Modbus RTU to the VSD's documented port | plant WiFi (VSD panel is inside a switchroom with coverage) | C1 read + documented writes |
| WeighIndicator RA-37 | Weighing indicator — feed mills, blending, packaging | RS-232 continuous or polled output from the indicator | 4G LTE (mill floor, no data drop) | C0 full takeover |
| PLCBridge RA-38 | Legacy PLC with Modbus TCP — plant-wide, all industries | Modbus TCP over the panel's own Ethernet port | 4G LTE router with an outbound-only tunnel (no inbound port) | C0 full takeover |
| MoistureMeter RA-39 | Online moisture meter — grain, food, minerals | RS-232 or 4–20 mA from the meter | 4G LTE (dryer or silo area) | C0 full takeover |
| DensityMeter RA-40 | Slurry density meter — mineral processing, tailings | 4–20 mA or HART digital read to the meter's documented output | 4G LTE (plant deck, no network) | C1 read + documented writes |
| ChillerBMS RA-41 | Chiller plant BMS gateway — HVAC, process cooling, cold chain | Modbus TCP to the plant's BMS controller | plant WiFi or 4G LTE failover | C0 full takeover |
| CompressedAirAudit RA-42 | Compressed-air audit point — manufacturing, mining, food | 4–20 mA pressure and flow transmitters (2 loops) | 4G LTE (compressor room has no data drop) | C0 full takeover |
| SiloLevel RA-43 | Silo level — grain, feed, minerals, cement | Ultrasonic or radar level sensor on a LoRaWAN node (4–20 mA optional) | LoRaWAN (roof-mounted, battery, no cable to the silo) | C1 read + documented writes |
| BearingTemp RA-44 | Bucket elevator bearing — grain handling, cement, fertiliser | Surface temperature sensor on a LoRaWAN node at each bearing (4 per kit) | LoRaWAN (elevator head is 30 m up, no cable) | C1 read + documented writes |
| DamLevel RA-45 | Tailings dam pond level — mining | Pressure or radar level on a LoRaWAN node with a solar supply | LoRaWAN to a site gateway, or NB-IoT where no gateway reaches | C1 read + documented writes |
| VibrationNode RA-46 | Pump and fan bearing vibration — water, chemical, mining | Triaxial vibration on a LoRaWAN node (2 per kit) | LoRaWAN (pump station, battery, no cable) | C1 read + documented writes |
| BundLevel RA-47 | Chemical bund liquid level — chemical storage, tank farms | Float or conductivity sensor on a LoRaWAN node (4 per bund) | LoRaWAN (bund has no power or data) | C1 read + documented writes |
| FuelTank RA-48 | Diesel and fuel tank level — camps, gensets, remote sites | Level sensor on a LoRaWAN or NB-IoT node | NB-IoT (tank is at a camp edge with no gateway) | C1 read + documented writes |
| ChuteBlockage RA-49 | Transfer chute blockage — conveyors, bulk transfer | Proximity or impact sensor on a LoRaWAN node at the chute | LoRaWAN (chute is inaccessible while running) | C0 full takeover |
| FirePanelWatch RA-50 | Fire indicator panel (FIP) — all sites | Isolated dry-contact inputs from the FIP's documented alarm/fault/isolate relay outputs | 4G LTE with an outbound-only tunnel | C2 MONITOR ONLY |
| GasDetectWatch RA-51 | Gas detection controller — chemical, mining, oil & gas, wastewater | Isolated 4–20 mA or dry contact from the controller's documented output | 4G LTE or NB-IoT (whichever the site's own radio survey supports) | C2 MONITOR ONLY |
| SafetyInterlockWatch RA-52 | Safety instrumented interlock (SIL-rated or not) — all process industries | Isolated voltage-free contacts from the interlock's documented status outputs | 4G LTE, outbound-only tunnel | C2 MONITOR ONLY |
| EStopStatusWatch RA-53 | Conveyor pull-wire / emergency-stop status — mining, bulk transfer | Isolated dry contacts from the e-stop system's documented status outputs | LoRaWAN or 4G LTE (whichever the site radio survey supports) | C2 MONITOR ONLY |
| BurnerManageWatch RA-54 | Burner management panel — dryers, kilns, boilers, asphalt | Isolated contacts from the BMS's documented alarm/lockout outputs | 4G LTE (burner house, no network) | C2 MONITOR ONLY |
| FlareHeaderWatch RA-55 | Flare and vent header local panel — oil & gas, chemical | Isolated contacts for pilot run, valve position, header pressure switch | 4G LTE or the site's own radio (no new network) | C2 MONITOR ONLY |
| DelugeWatch RA-56 | Deluge and foam system local panel — chemical, fuel, warehousing | Isolated contacts for valve-open, pressure-switch and fault | 4G LTE, outbound-only tunnel | C2 MONITOR ONLY |
| H2SAreaWatch RA-57 | Fixed H2S / toxic gas controller — oil & gas, wastewater, mining | Isolated 4–20 mA from the controller's documented output | 4G LTE or NB-IoT per the site radio survey | C2 MONITOR ONLY |
8 of the 57 kits are C2 and monitor only: FirePanelWatch, GasDetectWatch, SafetyInterlockWatch, EStopStatusWatch, BurnerManageWatch, FlareHeaderWatch, DelugeWatch, H2SAreaWatch.
A fire panel, a gas detection controller, a safety interlock, a burner management panel — these are read, logged and escalated. The C2 kit cannot press the button, suppress an alarm or drive an interlock. Its controller ships with no output path to disable, the app renders no actuate control for it, and a kit with no classification is refused rather than defaulted. That market gets a window, never a hand.
The other 49 kits take over the panel, because the alternative is a person walking to it.
The kit is supplied as parts, installed and commissioned by your licensed electrician. That framing is deliberate: we specify our terminals and the interface the manufacturer publishes, never a terminal inside your panel.
Every terminal on our own parts; the published interface we connect to (“the OEM documents Modbus RTU at 9600 8N1 over RS-485”); the method to confirm a point and prove isolation; power, fusing, isolation and surge requirements of our assembly; and exactly what the kit will and will not do once connected.
Which terminal inside your panel or device; an interface the OEM does not document; mains work of any kind; a connection point identified from a photograph of your panel; or a SIL claim. If the answer depends on hardware we have not seen, the answer is a question back to you.
Name the asset, the make and model, and the interface the manual documents. You get a written quotation and the interface method for that kit.
That is the case it is built for. Family A takes over the pushbutton and illuminated-indicator face; family B uses the serial port the OEM documents. Neither needs the panel to have Ethernet.
No. A fire panel kit is C2: it reports state and raises alerts, and the supplied module has no output path. There is no setting, licence or support agreement that changes that.
Your licensed electrician installs and commissions it. We supply the parts, the interface documentation and the method; mains work and anything inside your panel is theirs.
Your choice of web app, PLC, DCS, historian, cloud or on-premises system. The router opens an outbound tunnel only; no inbound port is opened on the plant network.
No. The kit is supplied as parts for a licensed installer, and no SIL, fire-system or gas-detection certification is claimed or implied. Certified work is a separate paid assessment, not a product.